top of page

Lake Poinsett Sanitary District

The mission of the Lake Poinsett Sanitary District is to protect public health, the environment and water quality, and support community well‑being by consistently providing reliable, efficient, and sustainable wastewater services to the Lake Poinsett community.

Phase 2 Lift Station Rehabilitation and Pier 81 Area & North Lake Drive Sanitary Sewer System Improvements

This is placeholder text. To change this content, double-click on the element and click Change Content.

This is placeholder text. To change this content, double-click on the element and click Change Content. Want to view and manage all your collections? Click on the Content Manager button in the Add panel on the left. Here, you can make changes to your content, add new fields, create dynamic pages and more. You can create as many collections as you need.


Your collection is already set up for you with fields and content. Add your own, or import content from a CSV file. Add fields for any type of content you want to display, such as rich text, images, videos and more. You can also collect and store information from your site visitors using input elements like custom forms and fields.


Be sure to click Sync after making changes in a collection, so visitors can see your newest content on your live site. Preview your site to check that all your elements are displaying content from the right collection fields.


Statistics

30

Connections

50

Miles

200

Lift Stations

Who is required to connect to the LPSD sanitary sewer system?

All properties within 1,000 feet the ordinary high water level of Lake Poinsett are under the jurisdiction of the LPSD and therefore, per LPSD ordinance, is required to connect to the LPSD system, once it becomes available. State law (SD CL 34A-5-35) also provides Sanitary Districts the legal authority to compel all properties within their district to connect to the central sanitary sewer system. Administrative Rule 74:53:01:07 specifies no on-site wastewater system permitted where a public sewer collection system is within 400 feet of the site. 

Is the land cost for the future lagoon included in the project cost?

No, the land for the lagoon location was purchased by the LPSD in 2024. Only the construction of the lagoon is included in the project estimate.

How will my property be connected?

It depends on where the mainline is located, but the intent would be for the sanitary sewer connection to begin at the location of the existing septic tank and go straight to the mainline.

What happens to my lawn or property after construction?

Past LPSD sanitary sewer projects have included installing new sewer service pipe from the collector main to a point of connection on the existing sewer service line past the demolished septic tank. Repairs would include replacing any pavement, grass, landscaping, etc. that was disturbed during construction.

Will this expense and effort actually result in better water quality?

The effect is admittedly hard to measure, but from the standpoint that there will no longer be septic systems with drain fields that seep into the ground, there will be less effluent that can potentially reach the lake. Also, there are water quality reports on the LPA Water Quality page that explain the poor water quality of Lake Poinsett over the last six years and that the top two contributing factors to that are agriculture and prive wastewater systems. 

Why is the lagoon so close to the lake if you’re concerned about lake contamination?

The LPSD purchased the site for the wastewater pond in 2024. The wastewater pond will be designed to serve customers on Northwest and West Lake Drive and Prairie Quay Drive. The wastewater pond will be designed as a total retention stabilization pond and the final design must be submitted to DANR for review and approval in compliance with their design and environmental standards. On June 22, 2026, the Hamlin County Board of Adjustment approved the LPSD application for a conditional use permit (CUP) for construction of the wastewater pond on the site once approved by the DANR.

Why should reimbursement for a working septic system/systems not be required, if we are being forced to hook up to the LPSD system?

Sanitary Districts only have the authority granted to them by state law (SD CL 43A-5-35). Authority granted to Sanitary Districts in SD CL 34A-5-35 does not grant the authority to use public money to compensate for a decommissioned private sewer.

Why is the LSPD doing the project now?

As outlined in the Lake Poinsett Management Plan, water quality is a main concern and the LPSD was created to aid in the effort of keeping Lake Poinsett clean by completing a sanitary sewer system around the lake. Also, the longer the LPSD waits on completing the system, the more expensive it is going to get.

What is the timeline?

As of April 2026, the schedule is for the engineering survey and design to likely begin fall of 2026 and continue into 2027 for the project to be bid. Construction may begin later in 2027 and be completed in 2028 to early 2029.

Will I be charged two connection fees and sewer fees if I have a house on a lake lot and a garage on a back lot?

If the same property owner has a garage with a bathroom on a back lot there is only one connection fee and sanitary sewer fee. The hope is that each sewer will be able to be connected as one.

Will there be a gravity line or a pump for each home?

This will be determined for each residence during design. Past LPSD expansion projects have included a combination of gravity service connections and pumped service connections based on the elevation of the home and the depth of the proposed sanitary sewer mainline.

Who is responsible for maintenance costs and repairs?

The LPSD owns and maintains the system from the sewer mains to the point of connection from the existing services and is responsible for all operation and maintenance expenses.

Was any consideration taken when choosing the lagoon location for smell and stink to the residents that are being forced to attach and pay for this?

Yes, the DANR has recommended criteria for separation of wastewater ponds from residences. The site meets these criteria. As stated in the answer to #5 the final site plan and wastewater pond design will be submitted to DANR for review and approval assuring compliance with DANR environmental standards.

Are there opportunities for additional grant funds?

First District Association of Local Governments and the SD DANR have both indicated that additional grant funds are unlikely.

What is this going to cost me?

Based on 2025 data, in their March funding approval document found on the LPSD website (a $2.5M grant and a $6.8M 30-year loan at 4% interest rate) the Department of Agriculture and Natural Resources (DANR) estimates $106.50 per month for all residents connected to the LPSD system upon the completion of Phase I to meet the required debt service coverage ratio. As described in some detail by the DANR, they require all revenue bonds to meet a 110% debt service coverage ratio, i.e. revenues must be at least 1.1 times expenses. The principal and interest payments to retire the $6.8M loan for this project will be included in the LPSD expenses for this calculation. Price inflation in 2026, 2027 and perhaps 2028 will increase the LPSD operating and maintenance expenses and thus will play a key role in determining revenues (revenue from monthly fees and property tax receipts) needed so revenues are 1.1 times expenses. Expenses, driven by market conditions, price inflation and debt service, are primary determinants of monthly fees for service. In addition to the monthly wastewater fee, there will be a one-time connection fee charged once all homes are connected to the LPSD system. 

What happens to my existing septic tank and drain field?

Generally, the septic tanks are demolished and filled in. Drain fields may be abandoned or removed depending on the location of new sewer pipes.

How deep will the pipe be placed in ground?

This will be determined during design, but generally the gravity sewer mains are a minimum of 8-feet deep. Maximum depth is determined by a combination of soil and site conditions along with cost considerations.

How many permanent residents and how many commercial properties are there in the 118 connections?

The assumption is that roughly 30%, or approximately 40, residents are permanent, when looking at Hamlin County data of who has a mailing address of West Lake Drive. There are no known commercial accounts in the Phase 1 project area at this time.

How are these septic systems any different than a 20k cow dairy that spreads manure across thousands of acres?

According to a recent report from DANR, available on the Lake Poinsett Association website, the top two contributing factors to poor water quality in Lake Poinsett are agriculture runoff and private septic systems. DANR regulates septic systems under ARSD 74:53:01. Hamlin County regulates septic systems through the building permit process. DANR regulates waste disposal for large Concentrated Animal Feeding Operations (CAFO) under SDCL 34A-2-27 and ARSD 74:52:01. DANR issues a permit based on an approved management plan.

Project Gallery

bottom of page